Friday, 24 July 2026Sevilla 36°/ 22°

diariosevillano

Breaking

Works and Infrastructure

Latest works and infrastructure news

1 article

Illustrative image: street with construction signs and freshly laid asphalt at sunset, with long shadows.

The Utrera Resurfacing Plan Resumes Works on Mar Adriático and Escultor Antonio Susillo

The Utrera Resurfacing Plan begins a new phase on Mar Adriático and Escultor Antonio Susillo, with milling and resurfacing until July 31 and traffic restrictions.